Cooper Green Design

concreteheader brickheader handheader greenheader whitetowerheader
Profile Services Projects Education Contact

Projects
On The Boards






















cgd-logo

On the Boards:

Waterford High School

The new addition to Waterford High School is a 125,000 sf classroom building on the existing high school campus. The project is seeking LEED Silver Certification under the LEED for Schools 2009 rating system and includes active chilled beams, a geothermal exchange system, and rain gardens that are integrated into the education and curriculum of the school. Architect: JCJ Architecture


Olin Research Center

The Olin Research Center is an 8,000 sf neurological research center addition on the Hartford Hospital campus. The project is seeking LEED Silver Certification and includes innovative landscape restoration, efficient MRI cooling systems, and recycled content materials. Cooper Green Design completed design phase credit documentation in September 2010. The project is anticipating LEED Silver Certification. Architect: Tecton Architects, Inc.


Congregation B'nai Israel

Cooper Green Design is providing pre-design services for Northampton's egalitarian Conservative congregation. Work includes an existing conditions survey, cost estimating, and program analysis.


Centerpoint CT

Cooper Green Design with 4 Elements Group is providing LEED consulting services for the Centerpont CT campus in Middletown, CT. The first phase includes 3 new buildings that are registered under the U.S. Green Building Council's LEED for Core & Shell Rating System and targeting a LEED Silver Certification. Architect: TyreSTUDIO


Cooper Green Design is moving on 6/15/2011. Please contact us for our temporary mailing address. Phone and email accounts will remain the same.
write:              talk: 413-306-4235